Viewed products
41,3 meter stern RSW PELAGIC TRAWLER
Circuit breaker Compact NS100N
Circuit breaker Compact NS100H - TMD - 50 A - 3 poles 3d
Circuit breaker Compact NS160H - STR22SE - 160 A - 3 poles 3d
Circuit breaker Compact NS160N - TMD - 160 A - 3 poles 3d
Circuit breaker Compact NS400H - STR23SE - 400 A - 4 poles 4d
M16 N1 Masterpact Merlin Gerin 1600 AMP 3 Pole(s) Circuit Breaker
M08 N1 Masterpact Merlin Gerin 800 AMP 3 Pole(s) Circuit Breaker
M08 H2 Masterpact Merlin Gerin 800 AMP 3 Pole(s) Circuit Breaker
41,3 meter stern TRAWLER
Used
41,3 meter stern RSW PELAGIC TRAWLER
Year | 1975 |
HP | 2100 |
kW | 1544 |
Fuel Type | Diesel |
Class | I.N.S.B. *H/M-100-A-E, UMS, Fishing Vessel* |
The vessel is ready for work and buyer-inspection.
Sandblasted and painted: April 2014
Overhaul of vessel: May 2014
A. Extensive repair of the ship in February and May 2014.
1. Casco of a ship – sandblast cleaning of the submerged hull and upperworks specializing in Sa1 and Sa2, thickness measurement of the hull, painting the underwater part in 5 layers and upperworks in 2 layers.
2. The main and auxiliary engines – extensive repair with the replacement of main and crank bearings, partial replacement of the cylinder-piston group.
3. Extensive repair of the reversible propeller, measuring and checking the machine propeller shaft, maintenance inspection and a step change gear, changing fore and aft simplex, cleaning of the shaft tube and oil replacement.
4. Steering arrangement – repair with the replacement of the rudder blade spindle.
5. Lateral thrusting propeller – extensive repair with hydromotor replacement.
6. Sea valves – extensive repair.
7. Electrical equipment – extensive repair of the electrical engines and generators, main switchboard, distributing switchboard with the insulation restoration and varnish coating.
8. Refrigeration machine – extensive repair of all Freon compressors with replacement of bearings and shaft seals. Repair of evaporators, condensers, separators, all pumps.
9. Installation of the new Echo-ranging set and two echo depth sounder vibrators, vibrators wires replacement.
10. New lathe was installed in the engine-room.
11. Deck machinery – extensive repair, new crane installation.
12. Field equipment – extensive repair.
13. Wheelhouse, cookhouse, saloon, cabins, corridors – renewal and repair.
14. New washing machine was purchased.
15. New cell 5 kw generator was purchased.
16. B. A new term with a satellite Internet connection was installed in the wheelhouse in October 2014.