Home

Manufacturers

Viewed products

41,3 meter stern RSW PELAGIC TRAWLER

41,3 meter stern TRAWLER

Used

41,3 meter stern RSW PELAGIC TRAWLER

More details

Data sheet

Year1975
HP2100
kW1544
Fuel TypeDiesel
ClassI.N.S.B. *H/M-100-A-E, UMS, Fishing Vessel*

More info

The vessel is ready for work and buyer-inspection.

  • Built: A/B Falkenbergs Varv, Sweden.
  • Year: 1975
  • Material: Steel
  • Max: 41,29m x 9.07m
  • Particular: 38,21m x 8,2m

  • Main Engine: Nohab F212 V-B 750 1544kW – 2100Hp
  • Propeller: Berg propulsion
  • Bow Thruster: 150hp
  • Aux Engine: Volvo Penta Tamd 162 390 kVA and Volvo Penta MD70BK 70kVa
  • Fuel tanks: 50,59 cbm
  • Fresh Water tanks: 15cbm
  • Sludge Water tank 8,58cbm
  • RSW: 465cbm in 9 RSW tanks (243 tons of fish)
  • Cooling system: 500 000kcal
  • Vacuum pump: MMC
  • Trawl winch: Lindan (upgraded in 2014)
  • Pulling force of winch: 20tons
  • Volume of net drum: (cbm) aft drum 14,2 and Other: 11,9
  • Electronic equipments:
     Furuno arpa -2007
     Furuno sounder
     Furuno FSV-24 Color Scaning Sonar
     Sodena Plotter
     Pilot AP45 and gyro
     Full GMSSD – 2007
     Satellite communication KVH TracPhone V3ip

Sandblasted and painted: April 2014
Overhaul of vessel: May 2014

  • Total running hours of the main engine: 168480
    Date of overhaul of the main engine: 19.05.2014
    Running hours after overhaul: 2193
  • Total running hours of the aux. engine: 36520
    Date of overhaul of the aux. engine: 19.05.2014
    Running hours after overhaul: 3680

A. Extensive repair of the ship in February and May 2014.
1. Casco of a ship – sandblast cleaning of the submerged hull and upperworks specializing in Sa1 and Sa2, thickness measurement of the hull, painting the underwater part in 5 layers and upperworks in 2 layers.
2. The main and auxiliary engines – extensive repair with the replacement of main and crank bearings, partial replacement of the cylinder-piston group.
3. Extensive repair of the reversible propeller, measuring and checking the machine propeller shaft, maintenance inspection and a step change gear, changing fore and aft simplex, cleaning of the shaft tube and oil replacement.
4. Steering arrangement – repair with the replacement of the rudder blade spindle.
5. Lateral thrusting propeller – extensive repair with hydromotor replacement.
6. Sea valves – extensive repair.
7. Electrical equipment – extensive repair of the electrical engines and generators, main switchboard, distributing switchboard with the insulation restoration and varnish coating.
8. Refrigeration machine – extensive repair of all Freon compressors with replacement of bearings and shaft seals. Repair of evaporators, condensers, separators, all pumps.
9. Installation of the new Echo-ranging set and two echo depth sounder vibrators, vibrators wires replacement.
10. New lathe was installed in the engine-room.
11. Deck machinery – extensive repair, new crane installation.
12. Field equipment – extensive repair.
13. Wheelhouse, cookhouse, saloon, cabins, corridors – renewal and repair.
14. New washing machine was purchased.
15. New cell 5 kw generator was purchased.
16. B. A new term with a satellite Internet connection was installed in the wheelhouse in October 2014.