Home

Manufacturers

Viewed products

New products

41,3 meter stern RSW PELAGIC TRAWLER

41,3 meter stern TRAWLER

Used

41,3 meter stern RSW PELAGIC TRAWLER

More details

  • Data sheet

    Year1975
    HP2100
    kW1544
    Fuel TypeDiesel
    ClassI.N.S.B. *H/M-100-A-E, UMS, Fishing Vessel*

    More info

    The vessel is ready for work and buyer-inspection.

    • Built: A/B Falkenbergs Varv, Sweden.
    • Year: 1975
    • Material: Steel
    • Max: 41,29m x 9.07m
    • Particular: 38,21m x 8,2m

    • Main Engine: Nohab F212 V-B 750 1544kW – 2100Hp
    • Propeller: Berg propulsion
    • Bow Thruster: 150hp
    • Aux Engine: Volvo Penta Tamd 162 390 kVA and Volvo Penta MD70BK 70kVa
    • Fuel tanks: 50,59 cbm
    • Fresh Water tanks: 15cbm
    • Sludge Water tank 8,58cbm
    • RSW: 465cbm in 9 RSW tanks (243 tons of fish)
    • Cooling system: 500 000kcal
    • Vacuum pump: MMC
    • Trawl winch: Lindan (upgraded in 2014)
    • Pulling force of winch: 20tons
    • Volume of net drum: (cbm) aft drum 14,2 and Other: 11,9
    • Electronic equipments:
       Furuno arpa -2007
       Furuno sounder
       Furuno FSV-24 Color Scaning Sonar
       Sodena Plotter
       Pilot AP45 and gyro
       Full GMSSD – 2007
       Satellite communication KVH TracPhone V3ip

    Sandblasted and painted: April 2014
    Overhaul of vessel: May 2014

    • Total running hours of the main engine: 168480
      Date of overhaul of the main engine: 19.05.2014
      Running hours after overhaul: 2193
    • Total running hours of the aux. engine: 36520
      Date of overhaul of the aux. engine: 19.05.2014
      Running hours after overhaul: 3680

    A. Extensive repair of the ship in February and May 2014.
    1. Casco of a ship – sandblast cleaning of the submerged hull and upperworks specializing in Sa1 and Sa2, thickness measurement of the hull, painting the underwater part in 5 layers and upperworks in 2 layers.
    2. The main and auxiliary engines – extensive repair with the replacement of main and crank bearings, partial replacement of the cylinder-piston group.
    3. Extensive repair of the reversible propeller, measuring and checking the machine propeller shaft, maintenance inspection and a step change gear, changing fore and aft simplex, cleaning of the shaft tube and oil replacement.
    4. Steering arrangement – repair with the replacement of the rudder blade spindle.
    5. Lateral thrusting propeller – extensive repair with hydromotor replacement.
    6. Sea valves – extensive repair.
    7. Electrical equipment – extensive repair of the electrical engines and generators, main switchboard, distributing switchboard with the insulation restoration and varnish coating.
    8. Refrigeration machine – extensive repair of all Freon compressors with replacement of bearings and shaft seals. Repair of evaporators, condensers, separators, all pumps.
    9. Installation of the new Echo-ranging set and two echo depth sounder vibrators, vibrators wires replacement.
    10. New lathe was installed in the engine-room.
    11. Deck machinery – extensive repair, new crane installation.
    12. Field equipment – extensive repair.
    13. Wheelhouse, cookhouse, saloon, cabins, corridors – renewal and repair.
    14. New washing machine was purchased.
    15. New cell 5 kw generator was purchased.
    16. B. A new term with a satellite Internet connection was installed in the wheelhouse in October 2014.