Home

Manufacturers

Viewed products

New products

41,3 meter stern RSW Pelagic Trawler

41,3 meter stern TRAWLER

Used

41,3 meter stern RSW PELAGIC TRAWLER

More details

Price on request

or call +47 908 92 500

Data sheet

Year 1975
HP 2100
kW 1544
Fuel Type Diesel
Class I.N.S.B. *H/M-100-A-E, UMS, Fishing Vessel*

More info

The vessel is ready for work and buyer-inspection.

  • Built: A/B Falkenbergs Varv, Sweden.
  • Year: 1975
  • Material: Steel
  • Max: 41,29m x 9.07m
  • Particular: 38,21m x 8,2m

  • Main Engine: Nohab F212 V-B 750 1544kW – 2100Hp
  • Propeller: Berg propulsion
  • Bow Thruster: 150hp
  • Aux Engine: Volvo Penta Tamd 162 390 kVA and Volvo Penta MD70BK 70kVa
  • Fuel tanks: 50,59 cbm
  • Fresh Water tanks: 15cbm
  • Sludge Water tank 8,58cbm
  • RSW: 465cbm in 9 RSW tanks (243 tons of fish)
  • Cooling system: 500 000kcal
  • Vacuum pump: MMC
  • Trawl winch: Lindan (upgraded in 2014)
  • Pulling force of winch: 20tons
  • Volume of net drum: (cbm) aft drum 14,2 and Other: 11,9
  • Electronic equipments:
     Furuno arpa -2007
     Furuno sounder
     Furuno FSV-24 Color Scaning Sonar
     Sodena Plotter
     Pilot AP45 and gyro
     Full GMSSD – 2007
     Satellite communication KVH TracPhone V3ip

Sandblasted and painted: April 2014
Overhaul of vessel: May 2014

  • Total running hours of the main engine: 168480
    Date of overhaul of the main engine: 19.05.2014
    Running hours after overhaul: 2193
  • Total running hours of the aux. engine: 36520
    Date of overhaul of the aux. engine: 19.05.2014
    Running hours after overhaul: 3680

A. Extensive repair of the ship in February and May 2014.
1. Casco of a ship – sandblast cleaning of the submerged hull and upperworks specializing in Sa1 and Sa2, thickness measurement of the hull, painting the underwater part in 5 layers and upperworks in 2 layers.
2. The main and auxiliary engines – extensive repair with the replacement of main and crank bearings, partial replacement of the cylinder-piston group.
3. Extensive repair of the reversible propeller, measuring and checking the machine propeller shaft, maintenance inspection and a step change gear, changing fore and aft simplex, cleaning of the shaft tube and oil replacement.
4. Steering arrangement – repair with the replacement of the rudder blade spindle.
5. Lateral thrusting propeller – extensive repair with hydromotor replacement.
6. Sea valves – extensive repair.
7. Electrical equipment – extensive repair of the electrical engines and generators, main switchboard, distributing switchboard with the insulation restoration and varnish coating.
8. Refrigeration machine – extensive repair of all Freon compressors with replacement of bearings and shaft seals. Repair of evaporators, condensers, separators, all pumps.
9. Installation of the new Echo-ranging set and two echo depth sounder vibrators, vibrators wires replacement.
10. New lathe was installed in the engine-room.
11. Deck machinery – extensive repair, new crane installation.
12. Field equipment – extensive repair.
13. Wheelhouse, cookhouse, saloon, cabins, corridors – renewal and repair.
14. New washing machine was purchased.
15. New cell 5 kw generator was purchased.
16. B. A new term with a satellite Internet connection was installed in the wheelhouse in October 2014.